RBLX generates Inspection Plan for Pressure Vessels, Columns, Piping, Air Coolers, Heat Exchangers, Atmospheric Storage Tanks & Pressure Relief Devices per API 581 2016, ADDENDUM 2019. The inspection plan suggests dates and inspection effectiveness. Inspection method and coverage are deduced from the inspection effectiveness. RBLX allows users to assign risk target if default risk target is not acceptable.
Call Us: +44 (0) 1224 824112 | Email : info@lteng.co.uk
How is the inspection plan generated from the risk results and describe the inspection plan contents?
© 2020 Copyright LifeTech Engineering Ltd - All Rights Reserved